Skip to content
CabinetHub

Millwork takeoff services · Architectural millwork and casework · Division 06

Millwork takeoff that reads the elevations, the sections and the spec, not just the plan.

A millwork takeoff is the quantity list for an architectural millwork package: every cabinet, reception desk, built-in, wall panel, countertop and run of standing and running trim the architect put on the drawings, with the dimensions, grade, material and finish the specification calls for. It is harder than a cabinet count because the scope is mixed. Some items are boxes, some are linear feet, some are custom assemblies that need a sketch before they can be priced.

CabinetHub takes off the millwork package the way a millwork estimator does: room by room, elevation by elevation, with the sections and details open beside the plan and the Division 06 spec open beside both. You get back a list with a sheet reference on every line, so your estimator starts at the review and the pricing instead of at page one.

PDF plan sets · Estimator-reviewed · First takeoff: pay only if you're satisfied · Updated

What a millwork takeoff includes

  • Casework by the box. Base, wall, tall and specialty cabinets with width, height and depth, door and drawer configuration, finished ends and interior finish, tagged to the architect's casework schedule where there is one.
  • Custom assemblies. Reception and transaction desks, nurse stations, teller lines, banquettes, display fixtures and built-in seating, listed as assemblies with their component counts and the detail sheets that describe them.
  • Wall and ceiling millwork. Paneling by the square foot with panel sizes and layout, wainscot, chair rail, ceiling features and column covers, with the detail reference for each profile.
  • Standing and running trim. Base, casing, crown, chair rail and reveal by the linear foot per room, with species or finish code and the profile detail.
  • Countertops. Solid surface, quartz, stone, laminate and wood tops by run, with depth, edge, splash and cutouts, and a note on whether the spec puts them in your package.
  • Grade, material and finish. AWI or AWS grade from the spec (Economy, Custom or Premium), species and cut, veneer matching, plastic laminate or paint codes from the finish legend.
  • Sheet references and flags. Every line points to its sheet and elevation or detail. Items the drawings leave open, such as a desk with a plan but no section, are flagged for your review.

For the scope definitions behind this list, see what is millwork and casework vs millwork.

How millwork takeoff works at CabinetHub

  1. Upload the plan set. Architectural plans, enlarged plans, interior elevations, millwork details and sections, finish schedule and legend, the Division 06 specifications and every addendum.
  2. Get the takeoff. An estimator prepares and reviews the list, counting per elevation and reading each assembly against its details.
  3. Review it against the drawings. Open the list next to the sheets it references. Add, edit or remove lines. Resolve the flags.
  4. Price it with your rates. Boxes, linear feet, panel square feet, drafting hours, finishing and install, with your burdened rate and margin.
  5. Send the bid when you decide to. Track it, and if it is awarded, issue purchase orders and track fulfillment from the same project.

Your first takeoff is reviewed before you pay anything. You pay only if it is useful to you.

Why millwork takeoffs go wrong

Millwork scope hides in places a plan-only count never finds. The reception desk has a plan outline, but its height, transaction top, grommets, lighting cove and the steel it hangs on live in four section details on a sheet nobody opened. The paneling square footage is on the elevations, but the reveal spacing that sets the panel count is in a detail. The spec moved countertops to another section, or added a second finish for all casework in patient rooms, in an addendum issued three days before bid.

A millwork takeoff that records the sheet reference for every line and flags the gaps is the only kind you can check in an hour. That is the standard CabinetHub holds every list to. The commercial casework guide covers the specification side in detail, and cabinet shop drawings covers what happens to the list after award.

Before you try it

It does

  • Takes off architectural millwork packages: casework, custom desks and built-ins, paneling, standing and running trim, countertops.
  • Reads the sections and details, not just the plans and elevations, and lists custom assemblies with their component counts.
  • Records AWI grade, species, veneer matching, laminate and paint codes from the spec and finish legend.
  • Puts a sheet reference on every line and flags what the drawings leave unresolved.
  • Lets you price with your own rates and send the bid from the same project.

It doesn't

  • Price the package. Drafting, finishing, hardware, install and margin are yours to set.
  • Engineer the assemblies. Steel supports, blocking and attachment are noted when the details show them, not designed.
  • Produce shop drawings, cut lists or CNC programs.
  • Take off doors, frames and hardware, or finish carpentry that the spec places outside the millwork package, except where your scope includes them.
  • Share your drawings with anyone, including suppliers you request quotes from.

Eight millwork estimator questions

What is the difference between a millwork takeoff and a cabinet takeoff?

A cabinet takeoff counts boxes with dimensions. A millwork takeoff does that and also counts custom assemblies, paneling by the square foot, trim by the linear foot and countertops by the run, with grade, species and finish from the Division 06 specification. The method is the same, but there are more unit types and the details matter more.

How do you estimate millwork from drawings?

Start with a page index of every sheet that carries millwork scope. Count room by room and elevation by elevation, left to right. For each custom assembly, find the sections and details before you write the line. Record linear feet for trim and square feet for paneling by room. Pull grade, species, matching and finish from the spec and finish legend. Then price each unit type with your own rates. The cabinet takeoff guide walks through the counting method step by step.

What AWI grade should the takeoff record?

Whatever the specification says, section by section. Many projects specify Custom grade for most millwork and Premium for the feature pieces such as a reception desk or a boardroom. The takeoff records the grade against each item so your pricing can carry the difference in material, machining and finishing.

Do you count paneling by the panel or by the square foot?

Both. Square footage per room sets the material, and the panel layout from the elevations and reveal details sets the panel count and sizes, which drive machining and finishing time.

Are countertops part of a millwork takeoff?

They are counted as runs on every elevation, with depth, edge profile, splash and cutouts, and the spec section they fall under is noted. Whether they are in your bid depends on the spec and the bid form, so the takeoff lists them and lets you include or exclude them.

How long does a millwork takeoff take?

By hand, a mid-size commercial package with casework, a desk or two and running trim is most of a day; a large hospitality or healthcare package can be several days. The service takes the counting off your estimator so the time goes to review and pricing.

Can I use the takeoff for my shop drawings later?

The list carries the architect's tags, dimensions, finishes and sheet references, which is exactly what the drafter needs to start. Shop drawings themselves are not part of the takeoff.

What does a millwork takeoff cost?

A flat fee per takeoff, shown when you create your account. Your first takeoff is reviewed before you pay, and you pay only if you are satisfied with it.

Get your next takeoff done for you

Upload a plan set and get an estimator-reviewed cabinet takeoff: every cabinet with its type, size, room and sheet reference, traceable to the drawing. Price it with your own rates and send the bid from CabinetHub.

First takeoff: pay only if you're satisfied.

Start my first takeoff

Other work we take off