Casework takeoff services · Plastic laminate, wood and lab casework · 06 41 00 and 12 32 00
Casework takeoff for commercial packages: every room, every elevation, every grade.
Commercial casework is counted in volume. A school has forty classrooms with a teacher wardrobe, a sink base and a run of wall cabinets each. A medical office has exam rooms, a nurse station and a lab. An office building has a break room on every floor. The casework takeoff has to get each room type right once and then get the count of rooms right, and it has to carry the plastic laminate code, the grade and the hardware the specification requires, because those decide the price as much as the box count does.
CabinetHub takes off commercial casework packages for shops bidding Division 06 41 00 architectural wood casework and Division 12 32 00 manufactured casework, including laboratory casework under 12 35 53 and the countertops under 12 36 00. You get back a room-by-room list with a sheet reference on every line and the spec requirements recorded against each item, ready for your review and your pricing.
PDF plan sets · Estimator-reviewed · First takeoff: pay only if you're satisfied · Updated
What a casework takeoff includes
- Cabinets per room, per elevation. Base, wall, tall, wardrobe, sink base, knee space and specialty units with width, height and depth, door and drawer configuration, finished ends and interior finish.
- Room type multiplication. Repeated rooms such as classrooms, exam rooms and patient rooms are taken off once per type, with the room count and the room numbers, so you can check the multiplier against the plan.
- Spec requirements. Grade (AWS or NAAWS Economy, Custom or Premium), construction (frameless or face frame), core, laminate and edge codes, hardware such as hinges, slides, locks and pulls, and ADA requirements recorded against each item.
- Laboratory and healthcare casework. Fume hood bases, acid and flammable storage, sink units, reagent shelving, phenolic and epoxy resin tops, and removable or accessible units.
- Countertops as runs. Laminate, solid surface, phenolic, epoxy and stone tops with depth, edge, splash and cutouts per run, and the spec section they fall under.
- Accessories and coordination items. Tack and marker boards built into casework, sinks and fittings by others, outlets and data in casework, and locks and keying.
- Sheet references and flags. Every line points to its sheet and elevation. Missing elevations, plan and elevation conflicts and unit counts that disagree with the schedule are flagged.
For the specifications and standards behind these lines, see the commercial casework guide and plastic laminate casework.
How casework takeoff works
- Upload the plan set. Architectural plans, enlarged plans, interior elevations, casework schedules, details, the finish schedule and legend, Division 06 and 12 specifications and every addendum.
- Get the takeoff. An estimator prepares and reviews the list, room type by room type, with the spec open beside the elevations.
- Review it. Open the list next to the sheets. Check the room multipliers, resolve the flags, add or edit lines.
- Price it. Per box by size and configuration, with laminate color count, hardware, tops and install, at your own rates and margin.
- Send the bid when you decide to. Track it, and after award issue purchase orders and track fulfillment from the same project.
Your first takeoff is reviewed before you pay. You pay only if you are satisfied.
Where commercial casework bids lose money
The count is rarely the problem. The problem is the room that appears on the plan without an elevation, the addendum that changed the laminate from one color to a two-color scheme, the ADA sink base that is drawn as a standard one, the classroom type that the plan shows twenty-two of while the schedule says twenty, and the countertop section that moved out of your package. Each of those is a line in the takeoff with a flag and a sheet reference, so you find it in review rather than in the field.
A takeoff that records what the specification requires against each item also makes the pricing honest. Custom grade with 3 mm edgebanding and institutional hinges is a different box from Economy grade with self-edge and overlay hinges, and the list should say which one you are bidding. See what is casework in construction for the scope definitions and casework vs millwork for where the package boundaries usually fall.
Before you try it
It does
- Takes off plastic laminate, wood veneer, laboratory and healthcare casework from commercial plan sets.
- Lists repeated room types once with their room counts and room numbers.
- Records grade, construction, core, laminate, edge, hardware and ADA requirements from the spec against each item.
- Counts countertops as runs and notes the spec section they fall under.
- Puts a sheet reference on every line and flags the conflicts and gaps.
It doesn't
- Set your unit prices or your margin.
- Take off the trades around the casework: plumbing fixtures, electrical devices, tack boards and markerboards supplied by others are noted for coordination, not counted for your bid.
- Produce submittals, shop drawings or cut lists.
- Decide whether countertops, installation or lab fittings are in your scope; it records what the spec and drawings say so you can decide.
- Share your plans with anyone.
Eight casework estimator questions
What is a casework takeoff?
A casework takeoff is the list of every cabinet, countertop and related item in a commercial casework package, counted from the drawings by room and elevation, with dimensions, configuration, grade, material and finish from the specification, and a sheet reference for every line. It is the quantity side of a Division 06 or Division 12 casework bid.
How do you take off casework for a school or hospital?
Build a page index, identify the room types from the enlarged plans and schedules, take off each type once from its elevations, verify the count of rooms per type against the plans, then add the one-off rooms such as nurse stations, reception and labs. Record grade, laminate and hardware from the spec against each item and count tops as runs. The cabinet takeoff guide covers the counting method and the multiplier check.
What is the difference between Division 06 and Division 12 casework for the bidder?
Division 06 41 00 is architectural wood casework, custom built to the AWS or NAAWS standard and usually bid by a millwork or casework shop. Division 12 32 00 is manufactured casework, built to a manufacturer's standard product line and often bid by a dealer. Many projects use both. The takeoff records which section each item falls under so you can bid the sections you want.
Does the takeoff include laboratory casework?
Yes. Lab casework under 12 35 53, with fume hood bases, flammable and acid storage, sink units, reagent shelves and resin or phenolic tops, is counted with the rest of the package and the spec requirements recorded against it.
How does the takeoff handle repeated classrooms or exam rooms?
Each room type is taken off once from its elevations and listed with its room count and room numbers. You can check the multiplier against the plans in review, which is where most count errors on institutional work are caught.
Are countertops included in a casework takeoff?
They are counted as runs on every elevation, with material, depth, edge, splash and cutouts, and the spec section noted. Whether they are in your bid depends on the spec and bid form, so the takeoff lets you include or exclude them.
How long does a commercial casework takeoff take?
By hand, a school or clinic package is often a full day or more, most of it spent confirming room counts and reading the spec. With the counting done, your time goes to the review and the pricing.
What does a casework takeoff cost?
A flat fee per takeoff, shown when you create your account. Your first takeoff is reviewed before you pay, and you pay only if you are satisfied with it.