Cabinet Estimate Template (Free Bid and Quote Layout)
In this guide
- How to use this cabinet estimate template
- 1. Header information
- 2. Scope and inclusions
- 3. Line items by room
- 4. Materials, hardware and countertops
- 5. Shop labor
- 6. Installation
- 7. Delivery
- 8. Totals and margin
- 9. Alternates
- 10. Exclusions and qualifications
- 11. Terms
- Guidance on filling in a cabinet bid template
- Sample cabinet quote template excerpt
- Frequently asked questions
A cabinet estimate template is a standard layout your shop uses for every bid, so nothing gets left out: project details, scope, line items by room, materials, labor, installation, delivery, totals and margin, alternates, exclusions and terms. Using the same template on every job makes bids faster to build, easier to check and easier for customers to compare.
Below is a complete template you can copy into a spreadsheet or your estimating system, section by section, followed by guidance on filling it in and a short sample filled-out excerpt.
How to use this cabinet estimate template
The template has two halves. The internal estimate (sections 1 to 8) is where you build the cost and price; it is for your shop only. The customer bid (sections 1, 2, 9, 10 and 11, plus the total price) is what you send. Keep them in the same file so the bid always matches the numbers behind it, but never send the internal cost breakdown unless the contract requires it.
Every section below is a table or list you can copy directly. Replace the guidance text in each cell with your job's details.
1. Header information
| Field | What to enter |
|---|---|
| Shop name and contact | Your company name, address, phone, email, license number where required |
| Estimate / bid number | Unique number, for example year plus sequence |
| Revision | Rev 0 for the first issue; increase with each revised bid |
| Date issued | Date the bid is sent |
| Valid until | Date the price expires |
| Customer | Company or homeowner name, contact person, phone, email |
| Project name and address | Job name and site address |
| Bid due date | When the customer needs the number |
| Documents used | Plan set title and date, sheet list, spec sections, addenda numbers |
| Estimator | Who prepared and who checked the estimate |
The "documents used" line is the most important line in the header. It defines what your price is based on. If the architect issues a new addendum after you bid, this line shows that your number did not include it.
2. Scope and inclusions
Write the scope in plain sentences, then list what is included.
| Item | Included? | Notes |
|---|---|---|
| Cabinet boxes per takeoff | Yes / No | Construction standard, for example AWS Custom grade or your shop standard |
| Doors and drawer fronts | Yes / No | Style, material, finish |
| Finished ends, panels, fillers, scribes | Yes / No | Per takeoff |
| Toe kick, crown, light rail | Yes / No | |
| Cabinet hardware | Yes / No | Hinges, slides, pulls; specified or allowance |
| Specialty inserts and accessories | Yes / No | Trash pull-outs, organizers, lazy susans |
| Countertops | Yes / No | Material, edge, splash; or by others |
| Shop drawings and submittals | Yes / No | Number of review cycles included |
| Delivery | Yes / No | Number of deliveries assumed |
| Installation | Yes / No | Hours or conditions assumed |
| Field measuring | Yes / No | Number of site visits |
3. Line items by room
Base every line on the takeoff. If you need a refresher on building one, see how to do a cabinet takeoff.
| Line | Room | Tag | Description | W x H x D (in) | Qty | Material / finish | Sheet ref | Unit cost | Extended cost |
|---|---|---|---|---|---|---|---|---|---|
| 1 | |||||||||
| 2 | |||||||||
| 3 |
Group lines by room, and add a subtotal row under each room. Room subtotals make it easy to price alternates or deletions later ("what if we drop the laundry room?"). The sheet reference column lets anyone check a line against the drawings.
4. Materials, hardware and countertops
If you price by cost build-up instead of unit cost, summarize materials here.
| Category | Basis | Quantity | Unit | Unit cost | Waste % | Extended cost |
|---|---|---|---|---|---|---|
| Sheet goods (case material) | Takeoff | sheets | ||||
| Doors and drawer fronts | Supplier quote or shop-made | each | ||||
| Drawer boxes | Supplier quote or shop-made | each | ||||
| Edgebanding | Takeoff | LF | ||||
| Finish materials | Finish area | allowance | ||||
| Hinges | Door count | each | ||||
| Drawer slides | Drawer count | pair | ||||
| Pulls and knobs | Door and drawer count | each | ||||
| Specialty hardware and inserts | Takeoff | each | ||||
| Countertops | Fabricator quote | LF or SF | ||||
| Freight on purchased items | Supplier quotes | lot |
Record the supplier, quote number and quote date next to anything you buy out. Supplier prices change, and you want to know which quote your bid was based on.
5. Shop labor
| Task | Hours | Burdened rate | Cost |
|---|---|---|---|
| Engineering and shop drawings | |||
| Cutting and machining | |||
| Assembly | |||
| Finishing | |||
| Hardware install and packing | |||
| Shop labor total |
Use a burdened shop rate, not the hourly wage. The rate should include payroll costs, non-productive time and shop overhead. The method is covered in how to price custom cabinets.
6. Installation
| Item | Basis | Hours or qty | Rate | Cost |
|---|---|---|---|---|
| Install labor | Crew size x days | |||
| Travel time | Trips x hours per trip | |||
| Fasteners, shims, adhesives, consumables | Allowance | |||
| Site conditions | Stairs, elevator, parking, after-hours | |||
| Punch list and adjustments | Allowance | |||
| Installation total |
7. Delivery
| Item | Basis | Qty | Rate | Cost |
|---|---|---|---|---|
| Truck and fuel | Trips | |||
| Delivery crew | Hours | |||
| Storage, if the site is not ready | Weeks | |||
| Delivery total |
8. Totals and margin
| Line | Amount |
|---|---|
| Materials and hardware | |
| Countertops (if included) | |
| Outside services | |
| Shop labor | |
| Installation | |
| Delivery | |
| Job-specific costs (permits, bonds, rentals) | |
| Total cost | |
| Target margin | |
| Price = total cost / (1 - margin) | |
| Gross profit | |
| Sales tax (if applicable in your state) | |
| Bid total | |
| Price per LF of cabinet run (internal cross-check) |
Margin and markup are different. A 25% markup on cost is a 20% margin on price. If your target is margin, divide by one minus the margin instead of multiplying cost by one plus the markup.
9. Alternates
| Alt # | Description | Add / deduct | Amount |
|---|---|---|---|
| 1 | Example: upgrade to full-extension soft-close slides on all drawers | Add | |
| 2 | Example: delete countertops | Deduct | |
| 3 | Example: change painted doors to stained maple | Add |
Price each alternate as a separate cost build-up, apply the same margin, and state clearly whether it adds or deducts from the base bid. On commercial bids, match the alternate numbers and wording on the GC's bid form exactly.
10. Exclusions and qualifications
This is the section that prevents arguments later. Anything not excluded in writing may be assumed to be included. Start from this list and delete what does not apply:
- Countertops, backsplashes and sidesplashes, unless listed in the scope
- Appliances, sinks, faucets, disposals and plumbing fixtures
- Plumbing and electrical work, including outlets, lighting and wiring in or under cabinets
- In-wall blocking and backing, unless listed
- Demolition and removal of existing cabinets, unless listed
- Wall, floor and ceiling repair, patching and painting
- Moving or protecting the owner's belongings and furniture
- Permits, inspections and engineering
- Field finishing, touch-up or painting beyond normal installation touch-up
- Glass, mirrors and decorative metal unless listed
- Hardware beyond the listed hardware or allowance
- Appliance panels unless listed per appliance
- Work outside normal business hours
- Prevailing wage, union labor, bonds and special insurance unless stated in the bid
- Fire-rated, lab-grade or ADA-specific casework unless shown and listed
- Items marked NIC, by owner or by others on the drawings
- Changes after shop drawing approval, which are priced as change orders
- Delays and storage caused by site readiness outside our control
- Walls and floors assumed plumb, level and square within normal tolerances; extra scribing or shimming is priced as extra work
- Price based only on the documents listed in the header; later addenda or revisions may change the price
- Quantities per the takeoff; filler widths assumed where the drawings do not dimension them
Qualifications are the other half: short statements of what you assumed. For example: "Casework built to AWS Custom grade per spec section 06 41 16," "One delivery and one mobilization assumed," or "Two rounds of shop drawing review included." For more on submittals, see cabinet and millwork shop drawings.
11. Terms
| Term | What to state |
|---|---|
| Price validity | How many days the price is good for, because material costs move |
| Deposit | Amount or percentage due at signing, and that ordering and production start after it is received |
| Progress payments | Payments tied to milestones such as delivery and installation, or monthly billing on commercial work |
| Final payment | Due on completion or within a stated number of days |
| Retainage | On commercial work, the percentage held and when it is released |
| Schedule | Lead time from approved drawings and deposit to delivery |
| Change orders | Must be in writing and approved before the work is done |
| Warranty | What is covered and for how long |
| Acceptance | Signature and date lines for customer acceptance |
Set your own deposit and payment terms. Check your state's rules on deposits, lien notices and contract requirements for residential work, which vary.
Guidance on filling in a cabinet bid template
- Fill the header first, especially the documents used. If you cannot list the sheets and addenda, you are not ready to price.
- Build line items from a checked takeoff, room by room, with a sheet reference on every line.
- Price buyouts from current quotes, not last year's price list. Note the quote numbers.
- Estimate hours from your own history, by task, and use your burdened rates.
- Total the cost, apply margin, and cross-check the result against your historical price per linear foot for similar jobs.
- Write exclusions and qualifications specific to this job. Delete generic lines that do not apply; vague exclusions protect no one.
- Have a second person check the bid before it goes out, at minimum the header, totals and exclusions.
- Record the bid in your tracking list with the due date and a follow-up date. See bid tracking for cabinet shops.
Sample cabinet quote template excerpt
Example numbers only. Every figure below is illustrative; use your own costs, hours and rates.
Header: Bid 2026-041, Rev 0. Kitchen remodel. Based on plan set "Kitchen Remodel" sheets A-101 and A-401, interior elevations 1 to 4 on A-401, no addenda.
| Line | Room | Tag | Description | W x H x D (in) | Qty | Finish | Sheet ref |
|---|---|---|---|---|---|---|---|
| 1 | Kitchen | SB36 | Sink base, 2 doors, false front | 36 x 34.5 x 24 | 1 | Painted, white | 2/A-401 |
| 2 | Kitchen | DB18 | Drawer base, 3 drawers | 18 x 34.5 x 24 | 2 | Painted, white | 2/A-401 |
| 3 | Kitchen | W3030 | Wall, 2 doors | 30 x 30 x 12 | 2 | Painted, white | 2/A-401 |
| 4 | Kitchen | W3630 | Wall, 2 doors | 36 x 30 x 12 | 1 | Painted, white | 3/A-401 |
| 5 | Kitchen | DWP | Dishwasher panel | 24 opening | 1 | Painted, white | 2/A-401 |
| 6 | Kitchen | F3 | Filler | 3 x 30 | 2 | Painted, white | 2/A-401 |
| Totals (example) | Amount |
|---|---|
| Materials and hardware | $3,180.00 |
| Shop labor: 38 hours x $82.00 | $3,116.00 |
| Installation: 14 hours x $70.00 | $980.00 |
| Delivery: one trip | $250.00 |
| Total cost | $7,526.00 |
| Target margin | 25% |
| Price: $7,526.00 / 0.75 | $10,034.67 |
| Gross profit | $2,508.67 |
Exclusions on this sample: countertops, sink and faucet, plumbing and electrical, appliance installation, wall repair and painting. Terms: price valid 30 days; deposit due at signing; balance due on completion of installation.
If you would rather start from a takeoff than a blank sheet, CabinetHub gives shops an estimator-reviewed cabinet takeoff with every cabinet's type, size, room and sheet reference, then lets the shop price it with its own rates, build the bid and track it.
Frequently asked questions
What should a cabinet estimate include?
Project and customer details, the documents the price is based on, scope and inclusions, line items by room with sizes and sheet references, materials, labor, installation and delivery costs, a total, alternates, exclusions and qualifications, and terms for payment, schedule and validity.
What is the difference between a cabinet quote and a cabinet bid?
People use the terms loosely. A quote is often a price for a defined item or small job, while a bid usually answers a formal request, often from a general contractor, against a plan set and bid form. Both should list scope, exclusions and terms.
Should I show my costs and margin to the customer?
Usually not. Send the customer the scope, the price, alternates, exclusions and terms. Keep the internal cost build-up and margin in your own file, unless a cost-plus contract requires you to disclose them.
Can I use a spreadsheet as a cabinet estimating spreadsheet?
Yes. Copy the tables above into separate tabs, link the totals, and lock the formula cells so they are not overwritten. For the trade-offs between spreadsheets and other tools, see the cabinet estimating software buyer's guide.
How long should a cabinet bid be valid?
Long enough for the customer to decide, short enough that material prices do not move against you. A common approach is to state a fixed number of days and reserve the right to re-price after that. Pick a period that matches how often your supplier pricing changes.