Cabinet Estimate Template (Free Bid and Quote Layout)

Updated · 12 min read

In this guide
  1. How to use this cabinet estimate template
  2. 1. Header information
  3. 2. Scope and inclusions
  4. 3. Line items by room
  5. 4. Materials, hardware and countertops
  6. 5. Shop labor
  7. 6. Installation
  8. 7. Delivery
  9. 8. Totals and margin
  10. 9. Alternates
  11. 10. Exclusions and qualifications
  12. 11. Terms
  13. Guidance on filling in a cabinet bid template
  14. Sample cabinet quote template excerpt
  15. Frequently asked questions

A cabinet estimate template is a standard layout your shop uses for every bid, so nothing gets left out: project details, scope, line items by room, materials, labor, installation, delivery, totals and margin, alternates, exclusions and terms. Using the same template on every job makes bids faster to build, easier to check and easier for customers to compare.

Below is a complete template you can copy into a spreadsheet or your estimating system, section by section, followed by guidance on filling it in and a short sample filled-out excerpt.

How to use this cabinet estimate template

The template has two halves. The internal estimate (sections 1 to 8) is where you build the cost and price; it is for your shop only. The customer bid (sections 1, 2, 9, 10 and 11, plus the total price) is what you send. Keep them in the same file so the bid always matches the numbers behind it, but never send the internal cost breakdown unless the contract requires it.

Every section below is a table or list you can copy directly. Replace the guidance text in each cell with your job's details.

1. Header information

FieldWhat to enter
Shop name and contactYour company name, address, phone, email, license number where required
Estimate / bid numberUnique number, for example year plus sequence
RevisionRev 0 for the first issue; increase with each revised bid
Date issuedDate the bid is sent
Valid untilDate the price expires
CustomerCompany or homeowner name, contact person, phone, email
Project name and addressJob name and site address
Bid due dateWhen the customer needs the number
Documents usedPlan set title and date, sheet list, spec sections, addenda numbers
EstimatorWho prepared and who checked the estimate

The "documents used" line is the most important line in the header. It defines what your price is based on. If the architect issues a new addendum after you bid, this line shows that your number did not include it.

2. Scope and inclusions

Write the scope in plain sentences, then list what is included.

ItemIncluded?Notes
Cabinet boxes per takeoffYes / NoConstruction standard, for example AWS Custom grade or your shop standard
Doors and drawer frontsYes / NoStyle, material, finish
Finished ends, panels, fillers, scribesYes / NoPer takeoff
Toe kick, crown, light railYes / No
Cabinet hardwareYes / NoHinges, slides, pulls; specified or allowance
Specialty inserts and accessoriesYes / NoTrash pull-outs, organizers, lazy susans
CountertopsYes / NoMaterial, edge, splash; or by others
Shop drawings and submittalsYes / NoNumber of review cycles included
DeliveryYes / NoNumber of deliveries assumed
InstallationYes / NoHours or conditions assumed
Field measuringYes / NoNumber of site visits

3. Line items by room

Base every line on the takeoff. If you need a refresher on building one, see how to do a cabinet takeoff.

LineRoomTagDescriptionW x H x D (in)QtyMaterial / finishSheet refUnit costExtended cost
1
2
3

Group lines by room, and add a subtotal row under each room. Room subtotals make it easy to price alternates or deletions later ("what if we drop the laundry room?"). The sheet reference column lets anyone check a line against the drawings.

4. Materials, hardware and countertops

If you price by cost build-up instead of unit cost, summarize materials here.

CategoryBasisQuantityUnitUnit costWaste %Extended cost
Sheet goods (case material)Takeoffsheets
Doors and drawer frontsSupplier quote or shop-madeeach
Drawer boxesSupplier quote or shop-madeeach
EdgebandingTakeoffLF
Finish materialsFinish areaallowance
HingesDoor counteach
Drawer slidesDrawer countpair
Pulls and knobsDoor and drawer counteach
Specialty hardware and insertsTakeoffeach
CountertopsFabricator quoteLF or SF
Freight on purchased itemsSupplier quoteslot

Record the supplier, quote number and quote date next to anything you buy out. Supplier prices change, and you want to know which quote your bid was based on.

5. Shop labor

TaskHoursBurdened rateCost
Engineering and shop drawings
Cutting and machining
Assembly
Finishing
Hardware install and packing
Shop labor total

Use a burdened shop rate, not the hourly wage. The rate should include payroll costs, non-productive time and shop overhead. The method is covered in how to price custom cabinets.

6. Installation

ItemBasisHours or qtyRateCost
Install laborCrew size x days
Travel timeTrips x hours per trip
Fasteners, shims, adhesives, consumablesAllowance
Site conditionsStairs, elevator, parking, after-hours
Punch list and adjustmentsAllowance
Installation total

7. Delivery

ItemBasisQtyRateCost
Truck and fuelTrips
Delivery crewHours
Storage, if the site is not readyWeeks
Delivery total

8. Totals and margin

LineAmount
Materials and hardware
Countertops (if included)
Outside services
Shop labor
Installation
Delivery
Job-specific costs (permits, bonds, rentals)
Total cost
Target margin
Price = total cost / (1 - margin)
Gross profit
Sales tax (if applicable in your state)
Bid total
Price per LF of cabinet run (internal cross-check)

Margin and markup are different. A 25% markup on cost is a 20% margin on price. If your target is margin, divide by one minus the margin instead of multiplying cost by one plus the markup.

9. Alternates

Alt #DescriptionAdd / deductAmount
1Example: upgrade to full-extension soft-close slides on all drawersAdd
2Example: delete countertopsDeduct
3Example: change painted doors to stained mapleAdd

Price each alternate as a separate cost build-up, apply the same margin, and state clearly whether it adds or deducts from the base bid. On commercial bids, match the alternate numbers and wording on the GC's bid form exactly.

10. Exclusions and qualifications

This is the section that prevents arguments later. Anything not excluded in writing may be assumed to be included. Start from this list and delete what does not apply:

  • Countertops, backsplashes and sidesplashes, unless listed in the scope
  • Appliances, sinks, faucets, disposals and plumbing fixtures
  • Plumbing and electrical work, including outlets, lighting and wiring in or under cabinets
  • In-wall blocking and backing, unless listed
  • Demolition and removal of existing cabinets, unless listed
  • Wall, floor and ceiling repair, patching and painting
  • Moving or protecting the owner's belongings and furniture
  • Permits, inspections and engineering
  • Field finishing, touch-up or painting beyond normal installation touch-up
  • Glass, mirrors and decorative metal unless listed
  • Hardware beyond the listed hardware or allowance
  • Appliance panels unless listed per appliance
  • Work outside normal business hours
  • Prevailing wage, union labor, bonds and special insurance unless stated in the bid
  • Fire-rated, lab-grade or ADA-specific casework unless shown and listed
  • Items marked NIC, by owner or by others on the drawings
  • Changes after shop drawing approval, which are priced as change orders
  • Delays and storage caused by site readiness outside our control
  • Walls and floors assumed plumb, level and square within normal tolerances; extra scribing or shimming is priced as extra work
  • Price based only on the documents listed in the header; later addenda or revisions may change the price
  • Quantities per the takeoff; filler widths assumed where the drawings do not dimension them

Qualifications are the other half: short statements of what you assumed. For example: "Casework built to AWS Custom grade per spec section 06 41 16," "One delivery and one mobilization assumed," or "Two rounds of shop drawing review included." For more on submittals, see cabinet and millwork shop drawings.

11. Terms

TermWhat to state
Price validityHow many days the price is good for, because material costs move
DepositAmount or percentage due at signing, and that ordering and production start after it is received
Progress paymentsPayments tied to milestones such as delivery and installation, or monthly billing on commercial work
Final paymentDue on completion or within a stated number of days
RetainageOn commercial work, the percentage held and when it is released
ScheduleLead time from approved drawings and deposit to delivery
Change ordersMust be in writing and approved before the work is done
WarrantyWhat is covered and for how long
AcceptanceSignature and date lines for customer acceptance

Set your own deposit and payment terms. Check your state's rules on deposits, lien notices and contract requirements for residential work, which vary.

Guidance on filling in a cabinet bid template

  1. Fill the header first, especially the documents used. If you cannot list the sheets and addenda, you are not ready to price.
  2. Build line items from a checked takeoff, room by room, with a sheet reference on every line.
  3. Price buyouts from current quotes, not last year's price list. Note the quote numbers.
  4. Estimate hours from your own history, by task, and use your burdened rates.
  5. Total the cost, apply margin, and cross-check the result against your historical price per linear foot for similar jobs.
  6. Write exclusions and qualifications specific to this job. Delete generic lines that do not apply; vague exclusions protect no one.
  7. Have a second person check the bid before it goes out, at minimum the header, totals and exclusions.
  8. Record the bid in your tracking list with the due date and a follow-up date. See bid tracking for cabinet shops.

Sample cabinet quote template excerpt

Example numbers only. Every figure below is illustrative; use your own costs, hours and rates.

Header: Bid 2026-041, Rev 0. Kitchen remodel. Based on plan set "Kitchen Remodel" sheets A-101 and A-401, interior elevations 1 to 4 on A-401, no addenda.

LineRoomTagDescriptionW x H x D (in)QtyFinishSheet ref
1KitchenSB36Sink base, 2 doors, false front36 x 34.5 x 241Painted, white2/A-401
2KitchenDB18Drawer base, 3 drawers18 x 34.5 x 242Painted, white2/A-401
3KitchenW3030Wall, 2 doors30 x 30 x 122Painted, white2/A-401
4KitchenW3630Wall, 2 doors36 x 30 x 121Painted, white3/A-401
5KitchenDWPDishwasher panel24 opening1Painted, white2/A-401
6KitchenF3Filler3 x 302Painted, white2/A-401
Totals (example)Amount
Materials and hardware$3,180.00
Shop labor: 38 hours x $82.00$3,116.00
Installation: 14 hours x $70.00$980.00
Delivery: one trip$250.00
Total cost$7,526.00
Target margin25%
Price: $7,526.00 / 0.75$10,034.67
Gross profit$2,508.67

Exclusions on this sample: countertops, sink and faucet, plumbing and electrical, appliance installation, wall repair and painting. Terms: price valid 30 days; deposit due at signing; balance due on completion of installation.

If you would rather start from a takeoff than a blank sheet, CabinetHub gives shops an estimator-reviewed cabinet takeoff with every cabinet's type, size, room and sheet reference, then lets the shop price it with its own rates, build the bid and track it.

Frequently asked questions

What should a cabinet estimate include?

Project and customer details, the documents the price is based on, scope and inclusions, line items by room with sizes and sheet references, materials, labor, installation and delivery costs, a total, alternates, exclusions and qualifications, and terms for payment, schedule and validity.

What is the difference between a cabinet quote and a cabinet bid?

People use the terms loosely. A quote is often a price for a defined item or small job, while a bid usually answers a formal request, often from a general contractor, against a plan set and bid form. Both should list scope, exclusions and terms.

Should I show my costs and margin to the customer?

Usually not. Send the customer the scope, the price, alternates, exclusions and terms. Keep the internal cost build-up and margin in your own file, unless a cost-plus contract requires you to disclose them.

Can I use a spreadsheet as a cabinet estimating spreadsheet?

Yes. Copy the tables above into separate tabs, link the totals, and lock the formula cells so they are not overwritten. For the trade-offs between spreadsheets and other tools, see the cabinet estimating software buyer's guide.

How long should a cabinet bid be valid?

Long enough for the customer to decide, short enough that material prices do not move against you. A common approach is to state a fixed number of days and reserve the right to re-price after that. Pick a period that matches how often your supplier pricing changes.