Free Millwork Scope Checklist for Bid Review
By CabinetHub · Markdown · JSON
In this guide
Free downloads
No signup is required to download these files.
Download the editable checklist
Download the millwork scope review checklist. The plain-text file opens in a text editor and can be copied into your project notes or printed. It includes project and document-basis fields, a practical review list, an open-items table, and an illustrative unresolved countertop entry.
Use it before takeoff to define the package and again before submission to confirm what was priced. Treat the checklist as a structured conversation with the documents. Checking every box without recording the scope decision does not explain what the bid actually contains.
Assign a disposition to every applicable item
Use four dispositions: included, excluded, not applicable, or clarify. “Included” means the estimate contains the required quantity and cost basis. “Excluded” means the proposal expressly identifies the boundary where the project permits that qualification. “Not applicable” means the item genuinely does not occur. “Clarify” means the estimate still needs a documented decision.
Add a sheet, detail, specification, or buyer-instruction reference. The takeoff register can carry item-level references while the checklist records package-wide decisions. If an exclusion conflicts with the bid instructions, resolve that conflict before submission rather than relying on a hidden note.
Review the physical scope
Start with the new-work boundary. Separate new, existing, relocated, demolition, and owner-furnished items. Confirm the rooms and areas within your package. Check cabinet types, dimensions, exposed surfaces, fillers, scribe, finished ends, backs, and any other attributes affecting fabrication or installation.
Then follow related work deliberately:
| Scope group | Questions to resolve |
|---|---|
| Countertops and splashes | Who supplies them, what material applies, and what cutouts or supports occur? |
| Hardware and accessories | What is scheduled, what is specified, and what is owner furnished? |
| Wall panels and trim | Which areas, profiles, finishes, and interfaces are in this package? |
| Specialty items | Does the shop manufacture them or need a supplier quote? |
Use the hidden millwork scope guide to investigate items outside the obvious casework elevations. A complete cabinet count does not establish that all architectural woodwork was captured.
Review execution responsibilities
Identify field measurement, shop drawings, samples, submittals, fabrication, freight, unloading, storage, installation, protection, and closeout responsibilities where relevant. Check site access, phasing, work hours, and interfaces with other trades. These can change the estimate even when the cabinet quantities stay constant.
Do not replace a project-specific requirement with a shop habit. If a crew normally unloads with one method but the site requires another, the estimate needs the actual project assumption. Record uncertain execution requirements in the open-items table and obtain the appropriate project clarification.
Work through an illustrative scope gap
Suppose a fictional office elevation shows base cabinets and a countertop, but the invitation describes only “casework.” Mark cabinets included when counted and priced. Mark countertop responsibility clarify, with the sheet reference and the question: “Is the countertop included in the millwork package or separately procured?”
Assign an owner and a due date for the answer. Once confirmed, update the takeoff, estimate, and proposal together. Do not leave the checklist resolved while the estimate still uses the old assumption. The casework/countertop scope separation guide explains how to preserve that boundary.
Check revisions and commercial instructions
Review the drawing issue and every received addendum. Confirm quantity changes, material substitutions, alternate requirements, schedule changes, and revised forms. Use the addenda log to distinguish receipt from completed pricing and acknowledgment.
Finally, check the GC deadline and timezone, submission route, required forms, alternates, unit prices, proposal attachments, and validity. Cross-check the offer with the estimate so the scope narrative and calculated price describe the same package.
Close the open-items loop
An open issue should state the reference, question, potential quantity or price effect, responsible person, due date, and resolution. Some issues will be answered, some will become explicit assumptions where permitted, and some will justify declining or delaying the bid. Make the disposition observable.
Archive the completed checklist with the issued proposal and source estimate. On a later revision, reopen only the affected decisions and verify related interfaces. The checklist becomes useful project memory because it explains the choices behind the price rather than merely showing that a review occurred.
Related guides
- Free Millwork Takeoff Spreadsheet With a Worked Example
- Free Millwork Addenda Tracking Log
- How to Find Millwork Scope Hidden Outside the Casework Sheets
- How to Separate Casework, Countertop, and Installation Scope
Frequently asked questions
Does checking every item mean the bid is complete?
Only if each applicable item has a documented disposition and the estimate and proposal reflect it. A checked box without a quantity, cost, or scope decision is weak evidence.
What should happen to unanswered scope questions?
Keep an owner and due date, request clarification through the stated process, and record the resulting decision. Any remaining assumption must be handled transparently within the bid requirements.