MILLWORK SCOPE REVIEW CHECKLIST Project: ____________________ Buyer: ____________________ Drawing issue: ______________ Addenda: __________________ Reviewer: ___________________ Review date: ______________ Mark each item Included / Excluded / Not applicable / Clarify. Record a sheet or specification reference. [ ] New vs existing / relocated / owner-furnished work [ ] Casework counts, types, dimensions and room locations [ ] Fillers, scribe, finished ends, backs and exposed surfaces [ ] Countertops, cutouts, splashes, edges and supports [ ] Hardware, locks, accessories and specialty fittings [ ] Wall panels, trim, reception desks and specialty items [ ] Materials, finishes, grain or match requirements [ ] Field measurement, shop drawings and submittals [ ] Fabrication, supply, freight, unloading and storage [ ] Installation, site access, phasing and protection [ ] Interfaces with equipment, plumbing, electrical and other trades [ ] Alternates, allowances, unit prices and exclusions [ ] Drawings/specifications discrepancies and unanswered RFIs [ ] Current addenda reflected in quantities and pricing [ ] Buyer form, deadline, submission route and required attachments OPEN ITEMS ID | Sheet / section | Issue | Price or quantity effect | Owner | Due | Resolution ___|_________________|_______|__________________________|_______|_____|___________ ILLUSTRATIVE ENTRY EX-01 | 1/A403 | Countertop responsibility unclear | Separate until confirmed | Estimator | Before bid | Ask GC Completion means every applicable item has a documented disposition. A checked box alone does not establish contractual compliance.