Free Bid Tracking Spreadsheet for Millwork Shops
By CabinetHub · Markdown · JSON
In this guide
- Free downloads
- Download the shared bid register
- Keep project identity separate from buyer identity
- Use the columns to drive action
- Define statuses consistently
- Work through a weekly update
- Add fields when a real decision needs them
- Measure the pipeline without distorting it
- Related guides
- Frequently asked questions
Free downloads
No signup is required to download these files.
Download the shared bid register
Download the millwork bid tracking workbook. The single-sheet Excel file includes a practical status list, typed example dates, and twenty prepared rows. The examples show two fictional GCs pursuing one physical office project. Replace them with your own opportunities and store the working copy where the intended estimating users can access it.
The workbook does not search for jobs, synchronize a bid platform, send reminders, or contact buyers. It gives your shop a consistent record of the work it has found and the next action needed. Choose a file owner and a clear update process before several people begin editing separate copies.
Keep project identity separate from buyer identity
Use one project ID for the physical construction project. Create a row for each buyer whose bid requirements you are actively managing. This structure preserves the possibility of a shared takeoff while allowing separate deadlines, scope requests, and proposal outcomes.
For example, project EX-001 may have GC A asking for installed casework and GC B asking for a supply-only alternate. The tracker has two buyer rows but one physical project. Do not report two independent fabrication jobs simply because two buyers received a price. Read the multiple-GC bidding guide before consolidating quantities across buyers.
Use the columns to drive action
| Field | Practical use |
|---|---|
| Project and buyer | Identifies the physical work and the recipient |
| Scope | States the package being considered or priced |
| Source | Records where the opportunity or buyer was found |
| Buyer deadline | Controls the external submission schedule |
| Status | Shows the current observable stage |
| Next action, owner, date | Makes responsibility and timing explicit |
| Outcome note | Preserves award, loss, decline, or follow-up evidence |
Use the outcome field for facts rather than guesses. “GC confirmed award to another shop” is different from “no response yet.” Keep unknown outcomes open or identify them as unknown so win-rate reporting does not turn silence into a loss automatically.
Define statuses consistently
The prepared choices include developing, awaiting documents, qualifying, taking off, pricing, reviewing, submitted, awarded, lost, declined, and deferred. Each status should describe what is actually true. Receiving an invitation does not mean the project is in takeoff. Sending a proposal does not mean the buyer received or accepted it.
Use a bid/no-bid review before moving a project into significant estimating work. A missing document, unsuitable schedule, or unsupported fabrication requirement should remain visible as a qualification issue. Do not let a busy board substitute for a deliberate capacity decision.
Work through a weekly update
At the start of the week, add new opportunities and deduplicate physical projects. Assign an owner to qualify each relevant package. During the week, update the next action when a document, answer, or proposal changes the state. Before bid day, verify the actual buyer deadline, submission channel, and internal review time.
At the end of the week, review records whose action dates have passed and proposals awaiting outcome information. Close unsuitable opportunities with a reason. The weekly prospecting workflow explains how this register connects source review with an estimate-ready queue.
Add fields when a real decision needs them
The starting template is intentionally compact. Add columns for proposal number, estimate effort, drawing issue, addenda status, expected fabrication period, or installation phase if the shop uses those facts. Keep date columns as real dates and numeric fields as numbers so sorting and analysis remain reliable.
Avoid storing passwords, sensitive financial documents, or unnecessary personal information in a shared bid register. Link to an appropriately controlled project folder instead. Keep a stable naming convention for issued proposals and quantity schedules so the tracker can point to the exact version submitted.
Measure the pipeline without distorting it
Report distinct projects, buyer opportunities, submitted bids, and awards as separate measures. Track source contribution without crediting every duplicate as a newly discovered project. If you add value estimates, state whether they refer to a buyer proposal or the physical scope, and avoid summing mutually exclusive GC proposals as independent expected revenue.
Use the capacity-based pipeline guide when connecting the bid list to fabrication and installation workload. The tracker should help the shop select and deliver suitable work, rather than reward a growing list of unresolved invitations.
Related guides
- How to Build a Weekly Millwork Project Prospecting System
- Free Millwork Bid/No-Bid Scorecard
- How to Submit a Millwork Bid to Multiple General Contractors
- How to Build a Millwork Bid Pipeline That Matches Shop Capacity
Frequently asked questions
Does the tracker find projects automatically?
No. You enter opportunities from your approved sources. The workbook organizes the work, buyers, deadlines, responsibilities, and outcomes.
How should I track three GCs bidding one building?
Use the same project ID in three buyer rows. Keep their deadlines and scope requirements separate, and count the physical project once when analyzing production demand.